Dia-Dent Evofill Duo Cordless Obturation System

Cordless Warm Vertical Compaction & Backfill Obturation Device

7% OFF

Rs.139,995.00 Rs.150,000.00

Out of stock

Available offers

  • SAVE ₹100 Delivery Charges on Order Above ₹5,000.
  • SAVE ₹200 Discount on Order Above ₹10,000.
  • SAVE ₹500 Discount on Order Above ₹20,000.

Description

Cordless Warm Vertical Compaction & Backfill Obturation Device
Revolutionize your practice with the new EvoFillTM Duo cordless obturation system. With an innovative electric motor that prevents hand fatigue, EvoFill Duo offers fast heating and controlled gutta percha extrusion with precise 3D fills and reliable results.

Brand

Dia-Dent

FeaturesEvoPack Vertical Compaction Device Innovative LED light-guided condenser Save time with instant heating Tightly seals all canals including lateral canals Adjustable temperature setting and time Simple one-button operation EvoFill Backfill Obturation System Controlled, precise motorized gutta percha extrusion Fast heating bendable thin tip 3 different temperature settings to control extrusion speed (160℃, 180℃, 200℃) Hygienic single use fast loading gutta percha cartridge No mess, easy clean up
KEY Specifications

Charging time:Approx. 90 minutes Adapter:100~240V, 50/60Hz, 1A Operating Condition: Temperature: 10o C~ 40o C Atmospheric Pressure: 60~101 kPa Humidity: 30~85%

Directions To USE

Warm Vertical Compaction 1. Shape the root canal with endo files and determine the working length. Select a master cone that closely matches the apical size. 2. Insert Heating Condenser (EvoPack) into the root canal to the point 4~7mm short of the working length. Move and set the endo stop accordingly. 3. Insert the selected master Gutta Percha cone that is coated with sealer. 4. Place Heating Condenser (EvoPack) in the orifice of the canal and activate EvoPack by pressing the Operation Button. Using the activated Heating Condenser, cut the middle of Gutta Percha cone and downpack the soften material to the point 6~9mm from the apex for about 2 seconds only. 5. Release the Operation Button to allow the Heating Condenser to cool down, while at the same time continue pushing and holding the cooled Heating Condenser to the apex for 8 seconds. This ensures all lateral and accessory canals are filled. Activate the Heating Condenser again by pressing and holding the Operation Button for about 1.5 seconds, compact the Gutta Percha cone to the point 4~7mm of working length. 6. Condense the remaining material using a hand plugger.

Packaging

Regular kit contains EvoFill Hand piece EvoPack Handpiece and dual charger Accessories: Safety cap(1ea) heating condenser#F/FM(1ea) Power adapter cord Scrubbing brush.